
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richa...
The F/A-18 F404 Engine: Getting Lean (A)
Brownlee, E. Richard II; Cross, Tom; Osterhoudt, Robert; Jaynes, C. J.; Pottinger, Jeff
C-2268 | Published September 19, 2007 | 12 pages. Case
Collection: Darden School of Business
Product Details
The U.S. Navy Aircraft Intermediate Maintenance Depot (AIMD) Lemoore Power Plants Division (F404 engine maintenance) was a real mess. Not-Ready-For-Issue parts were everywhere. Division thru-put was poor, there were 30 F/A-18 aircraft with bare firewalls (no engines), the maintenance crews were working 12-hour days, manning was at 61% of authorized levels, reenlistment rates were an abysmal 50%, and crew morale was lousy. The Officer-in-Charge of the Aircraft Intermediate Maintenance Detachment decided to use Lean manufacturing to tackle the challenge. It would be the first application of the Lean concept to Naval Aviation.
0
Products To Upsell

Jonathan Virginia, Inc.
Hess, Edward D.

Chains
Larson, Andrea

3 Fellers Bakery
Hess, Edward D.

Sustainability and Innovation: Framework...
Larson, Andrea

Eyebobs Eyewear, Inc.
Hess, Edward D.; G...

SecureWorks
Hess, Edward D.; G...

Global Medical Imaging, LLC
Hess, Edward D.; G...

Enchanting Travels
Hess, Edward D.; M...